Pipeline subsea repair-DNVGL-RP-F113

Pipeline subsea repair-DNVGL-RP-F113

收藏豆荚
剥了 1 次
年级:未设置
科目:英语
Alisa_chen
2026-08-03
10 颗豆豆
1. 单选题
30 秒

A ______ pipe carries flow away from the main pipeline.

dent

branch

gouge

plug

2. 单选题
30 秒

Subsea pipelines lie on the ______.

seabed

blind end

bypass line

branch pipe

3. 单选题
30 秒

A ______ end means the pipe end is closed, no flow passes through.

continuous

equivalent

blind

original

4. 单选题
30 秒

One short cut part of a long pipeline is called a pipe ______.

segment

plug

spool

tap

5. 单选题
30 秒

______ design means the first design before modification.

Equivalent

Original

Continuous

Minimum

6. 单选题
30 秒

We use a ______ to block and seal a pipe opening.

dent

spool

fit

plug

7. 单选题
30 秒

______ load means a load that has the same effect as another load.

Original

Equivalent

Continuous

Minimum

8. 单选题
30 秒

We ______ the subsea equipment from a vessel down to the seabed.

isolate

deploy

bypass

tap

9. 单选题
30 秒

Minimum refers to the ______ possible value.

smallest

largest

stable

average

10. 单选题
30 秒

Isolation means to ______ equipment from the whole system.

lift upwards

separate and cut off

fill with fluid

clean completely

剥豆豆
金牌
会员
无限剥豆豆游戏,更详尽的游戏报告,更多学员的支持
仅需0.6/日
你可能喜欢
大气环流,地质运动,洋流
剥了 2 次
公司金融能力提升培训考试8月8日
剥了 7 次
RR老师的隋唐小测
剥了 2 次
啤酒知识
剥了 2 次
迪卡侬万柳店剥豆豆大赛4
剥了 2 次