Pipeline subsea repair-DNVGL-RP-F113

Pipeline subsea repair-DNVGL-RP-F113

收藏豆荚
剥了 1 次
年级:未设置
科目:英语
Alisa_chen
2026-07-22
10 颗豆豆
1. 单选题
30 秒

We add extra steel for structural ______ to strengthen the component.

reinforcement

degradation

tolerance

fatigue

2. 单选题
30 秒

After repair, the damaged pipe can be ______ back into service.

restrained

reinstated

injected

monitored

3. 单选题
30 秒

We take technical measures to ______ the risk of structural failure.

mitigate

inject

grip

activate

4. 单选题
30 秒

High cyclic load may create a ______ on the surface of subsea equipment.

reinforcement

tolerance

crack

activation

5. 单选题
30 秒

Long seawater exposure leads to material ______ and strength loss.

evaluation

restraint

grip

degradation

6. 单选题
30 秒

Clamps are used to ______ the pipe and stop unwanted movement.

inject

restrain

activate

reinstate

7. 单选题
30 秒

______ damage happens when parts receive repeated loads over time.

Fatigue

Tolerance

Capacity

Reinforcement

8. 单选题
30 秒

The tool provides strong ______ to hold the subsea component tightly.

monitor

crack

grip

evaluation

9. 单选题
30 秒

The difference between measured size and design value is controlled within ______.

capacity

fatigue

activation

tolerance

10. 单选题
30 秒

After final repair, we install a ______ fixing system for long-term use.

temporary

hyperbaric

fatigue

permanent

剥豆豆
金牌
会员
无限剥豆豆游戏,更详尽的游戏报告,更多学员的支持
仅需0.6/日
你可能喜欢
开封·最强大脑
剥了 2 次
Wiederholung-An der Rezeption
剥了 4 次
找物品
剥了 2 次
摄像基础知识小试牛刀
剥了 4 次
拓立珂互动环节
剥了 3 次