What manage information flow in pull system?
PIK Production Instruction Kanban
PooL stock
Shop stock
All the above
Your line works 9 hours with a 1 hour break. Your client expects 240 parts a day. What is your takt time?
2 minutes
1 minute
5 minutes
3 minutes
When must both the presence and the condition of PPE be checked?
Hourly
Weekly
At start of shift :before using
Monthly
The Group sets the goal that which of the following MOD should have an annual review?
All permanent Operators
All temps with more than 6 months service
All GAP Leaders
All 3 options are correct
How many Highly Recommended Logistic Guidelines relate to ‘Safe Vehicle’?
one
three
two
four
Who qualify the reworked product found in workstation 2?
Reworker = operator
Operator workstation 2
Operator
Reworker = Gap leader
How are cobots to be managed in a production line?
Considered as part of the work content.
TRS must be calculated.
Be considered as any other resource and part of cycle time diagram.
Not considered in the standard work chart.
which of the following is included in HSE MR NO8?
Locked access,Guardrails,Lifelines
Guardrails,Gloves,Helmets
Gloves,Lifelines,Guardrails
Lifelines,Locked access,Helmets
TRS should be measured for?
Only critical capacity equipment.
All plant equipment.
All capacity equipment.
All dedicated equipment.
NOK parts must be segregated to the quarantine area, identified with what colour label?
Red
Green
White
Yellow